Burt Process Equipment designed and delivered a fully integrated, containerized pH neutralization system (Model BPDN-150) for a manufacturing facility’s process wastewater treatment. The pre-engineered system, housed within a modified shipping container, was developed to provide a compact, turnkey solution that supports efficient treatment, operational flexibility, and environmental compliance while allowing for scalable future capacity.

Industry

Industrial Manufacturing

Challenge

Compact wastewater treatment

Solution

Containerized pH system

Project Scope
Deployment of a pre-engineered, containerized pH neutralization system to treat process wastewater prior to discharge. The system needed to be fully self-contained, modular, and scalable to support current and future capacity.
 
Challenge
The client required a compact, turnkey wastewater treatment solution that could be deployed with minimal disruption to existing operations. Space limitations, variable wastewater inflow, and strict environmental compliance standards demanded a highly efficient and flexible system.
 
Solution
Burt Process delivered a fully integrated containerized pH neutralization system (Model BPDN-150) housed within a modified shipping container. This modular solution was designed for plug-and-play installation and included all treatment, monitoring, and control equipment necessary for autonomous operation.

System Highlights:

Containerized Construction

  • System pre-installed in a 50’L x 8’W x 9.5’H insulated steel shipping container
  • Included personnel access doors, operable cargo doors, HVAC (with heat), and LED lighting
  • Integrated floor drain for maintenance and wash-down operations

Waste Neutralization Process

  • Dual 1,500-gallon baffled polypropylene reaction tanks with gear-driven mixers and magnetic drive recirculation pumps
  • Redundant high-level alarms and inline pH monitoring to ensure real-time treatment validation
  • Flow switch and effluent pH probes installed downstream for regulatory compliance

Reagent Dosing

  • Four peristaltic metering pumps for caustic and acid dosing
  • Separate 175-gallon double-wall chemical storage tanks
  • Compact containment and chemical injection hardware mounted on dedicated polypropylene shelving

Effluent Monitoring & Flow Control:

  • 10″ U-trap effluent discharge with manual isolation valves
  • pH sensor, magnetic flow meter, sample ports, and digital data recorder for detailed effluent tracking

Control & Automation

  • NEMA 4X UL-listed control panel with Allen-Bradley CompactLogix PLC and 7” HMI touchscreen
  • Ethernet connectivity for remote diagnostics and SCADA integration
  • Built-in programming flexibility for lift station alarms and future system expansion


Execution & Support

Startup & Training

  • Two 3-day field service trips included onsite setup supervision, system commissioning, and hands-on training for plant operators


Engineering Deliverables

  • Full documentation package including:
    • System layout drawings
    • P&ID and electrical ladder diagrams
    • Complete bill of materials with part references
    • Seismic anchoring calculations
    • Operating and maintenance manuals
    • PLC logic and HMI interface loaded prior to shipment


Factory Acceptance Testing (FAT)

  • System fully tested before shipment, with option for witnessed testing by owner representatives
Outcome
 

The containerized BPDN-150 system provided the client with a reliable, scalable, and compact wastewater treatment solution that was easy to deploy and operate. By integrating all components into a mobile unit, the project avoided complex on-site construction, reduced installation time, and met strict discharge requirements with confidence.